Ace Ethanol Phase I

Ethanol production facility in Stanley, Wisconsin

Industrial Process Installations:

     •       Intricate piping installations throughout the plant’s six buildings

Pipe Fabrication:

     •       Stainless and carbon steel pipe
     •       ½” to 32” diameter pipe


A NOTE FROM OUR CUSTOMER:

“There was a lot of communication, which was important considering the changes that were made after construction had already started. Ahern’s input was helpful in meeting the schedule.”

Alex Samardzich
Ace Ethanol