Arctic Glacier

Manufacturing facility in Menomonee Falls, Wisconsin. This project was a unique challenge to Ahern due to the short time frame of one month and the general contractor did not have control of rooms or electrical equipment.

Industrial/Process Installations: 

  • Carbon Steel and PVC pipe, up to ten inches in diameter 
  • Evaporative condenser 
  • Vessel 
  • Pumps 
  • Screw compressors 
  • Air cooling evaporators