HOME - J.F. Ahern Co.

Email Address:

C.D. Smith Construction Office Expansion

Design/build 5,500 square-foot office building addition and remodel 
in Fond du Lac, Wisconsin 

HVAC Installations: 

     •       3,300 linear feet of in-floor heating coil
     •       Nine-zone variable air volume system
     •       Specialized LEED-certified rooftop unit
     •       865 linear feet of copper piping
     •       140 linear feet of carbon steel piping
     •       Nearly 900 linear feet of galvanized ductwork 
     •       Three exhaust fans
     •       One expansion tank
     •       One air separator
     •       Three pumps
     •       One steam heating coil 


Plumbing Installations:

     •       Design and installation of a Green Water Collection System
             (rain water collected and used to flush new and existing toilets)
     •       1,800 linear feet of PVC, CPVC, copper, and PEX piping
     •       Five toiliet
     •       Four urinals
     •       Six lavatories
     •       One shower
     •       One sink
     •       One hose bibb

A NOTE ABOUT THIS PROJECT: 

“C.D. Smith’s expansion is receiving a LEED [Leadership in Energy and Environmental Design] Silver rating, which we are very proud to have helped them achieve.”

John Klinzing
Plumbing Senior Project Manager
J. F. Ahern Co.

 

A NOTE FROM OUR CUSTOMER:

“J. F. Ahern Co.'s team was professional, prompt, and brought a great deal of expertise to our project! The Ahern team was also very valuable in assisting us with our LEED certification. Their knowledge in the certification process was very helpful.”

Paul Smedberg
Project Manager
C.D. Smith Construction

 

Click here for further project details.

 
1-800-532-4376 © 2007 J.F. Ahern Co.