Deertrack ParkNewly constructed 6,400 square-foot methane gas generating facility. Ahern performed the HVAC equipment and sheetmetal installations on a plan & spec basis.
HVAC Installations:
- 334 feet of galvanized spiral ductwork
- 176 feet of galvanized rectangular ductwork
- Duct furnace
- 10-ton condensing unit
- Three (3) tube axial exhaust fans
- Three (3) inlet hoods
|