DePere Blower ReplacementWastewater treatment plant retrofit in DePere, Wisconsin
HVAC Installations:
- 500 linear feet of stainless steel and aluminum ductwork
- One make-up air unit
Pipe Fabrication:
- 2” to 36” prefabricated stainless steel pipe spools
Water/Wastewater Installations:
- Six bearlingless blowers
- Installation of pipe spools
A NOTE FROM OUR CUSTOMER:
"Ahern is always a pleasure to work with. Their staff are very professional, always keep safety in mind, and have all the necessary equipment. Ahern portrays the construction industry very well."
Mike Kersten
Operations Manager
City of DePere
(click on image for larger photos).
|