HOME - J.F. Ahern Co.

Email Address:

 

 

Project Showcase

Duke Cliffside Coal Conduit Piping

Prefabricated coal conduit piping for the Duke Cliffside Power Plant’s Unit 6 boiler project in Cliffside, North Carolina

Pipe Fabrication:

  • 376 carbon steel pipe spools, 10” to 26” diameter
  • Nearly 3,900 feet of pipe, with 20 spools of large-diameter, .500 inches wall thickness pipe bends needed


A NOTE ABOUT THIS PROJECT:

“This was our first opportunity to work with this particular customer. Our main challenge was delivering our fabricated spools, based on coordination with materials being supplied by other vendors for assembly prior to final shipping.”

John George
Project Manager
J. F. Ahern Co.