Kondex CorporationNewly constructed 154,825 square-foot plan & spec warehouse in Lomira, Wisconsin
Fire Protection Installations:
- Four (4) wet and one (1) dry sprinkler systems
- Electric fire pump
- VESDA air sampling smoke detection system
- FE-25 total flooding fire suppression system installed in the computer room
- Approximately 1,500 sprinkler heads
- 20,650 linear feet of piping
HVAC Installations:
- Variety of gas-fired and electric heaters
- Specialized Liebert cooling unit
- Two boilers
- Three dry coolers
- 180,000 pounds of ductwork
- 6,500 linear feet of heating and natural gas pipe
Plumbing Installations:
- 80 fixtures
- Three water heaters
- Variety of drains, cleanouts, sump pumps, and catch basins
- One 280-foot trench drain
- Approximately 19,000 linear feet of pipe
A NOTE FROM OUR CUSTOMER:
“Ahern has a solid reputation for always performing top-quality work. Both
C.D. Smith and the owner [were] very pleased to be working with Ahern, knowing they have the manpower and capabilities necessary to complete the project within the tight eight-month schedule. When Ahern is on the job, there is no questioning that their installations are correct.”
Greg Sabel
Project Manager
C.D. Smith Construction