HOME - J.F. Ahern Co.

Email Address:

 

 

Project Showcase

Manitowoc Public Utilities

Newly constructed raw water and finish water pump stations in Manitowoc, Wisconsin

Fire Protection Installations:

  • One wet sprinkler system with 14 sprinkler heads
  • 300 linear feet of piping
  • Corrosion resistant piping with wax coated heads

HVAC Installations:

  • Two rooftop air handling units
  • 200 linear feet of galvanized and PVC-coated ductwork

Wastewater Installations:

  • Large-diameter underground piping along Lake Michigan
  • 30”, 42”, and 60” ductile iron pipe with FlexRing restrained joints
  • Two 30” 400-HP vertical turbine pumps
  • One 12” 450-HP vertical turbine pump
  • Three 16” 900-HP vertical turbine pumps
  • One hydrofluosilicic acid feed system
test test
(click on image for larger photos).
 
New North