Alliant Columbia

Tabs

Overview
Pipe Fabrication Wisconsin

Pipe Fabrication for Wisconsin Power Plant

Ahern delivered nearly 1,100 prefabricated pipe spools in approximately 2 months to meet a tight installation schedule at Alliant Energy’s Pardeeville, Wisconsin power plant. Working with Babcock & Wilcox Power Generation Group, Ahern met this goal, in addition to stringent weld tolerances. At the peak of the project, Ahern’s pipe fabrication shop was completing between 50 and 70 spools per day. This included welding, sand blasting, painting, quality assurance, stenciling, and flange face engraving. A mix of 2-1/2” to 24” carbon and stainless steel piping was provided, all of which passed examination by Ahern’s QA/QC team and Babcock & Wilcox inspectors.

 Expertise Provided

Values Delivered

Schedule Assurance

  • All 1,092 pipe spools were delivered on time

Quality

  • All pipe lengths were within 1/16” of specification, per customer
  • 100% of the spools passed Ahern’s and customer’s QC inspections
Testimonials
Ahern’s team gave us a project schedule up front, and went ahead and delivered it. Quality was never an issue, they provided weekly spool reports, and kept the site informed with necessary paperwork for each shipment before it arrived. Ahern did a fantastic job.

Richard Hirzel

Purchasing Agent

Babcock & Wilcox