Des Moines Area Community College

Tabs

Overview

Ahern’s work on the Des Moines Area Community College posed an unusual challenge for the fire protection installation project. The 64,500 square-foot building was 40 degrees off center compared to the steel ceiling structure. On-site coordination issues arose between trades, but Ahern held an additional scheduling meeting to resolve the problem and the client was pleased with the resolution. Ahern’s prefabrication shop was utilized to produce the 665 sprinkler heads installed on the project.

Expertise Provided

Values Delivered

Quality

  • Ahern’s design was approved on the first submission, with no warranty rework

Issue Resolution

  • Held additional coordination meetings to improve on-site scheduling

Meeting Deadlines

  • 100% on-time completion

Safety

  • No OSHA recordables or lost-time injuries