MSOE Soccer & Parking Complex

Ahern performed multiple trades in MSOE’s unique sporting complex which consisted of a three story parking structure, with a soccer field on the roof of the structure. Serving as the subcontractor on this 381,672 square-foot project, Ahern’s knowledge in all three trades—plumbing, HVAC, and fire protection—eliminated coordination issues between the different disciplines. In addition to fabricating Ahern’s three trades, the Pipe Fabrication shop was able to provide over 1,000 feet of trench drains for the roof system, allowing the soccer field to be installed ahead of schedule.

Expertise Provided

Values Delivered

Schedule Assurance
  • 100% on-time completion
Budget Certainty
  • All work was completed under the estimated budget
Quality
  • All warranty rework was corrected quickly within 48 hours
Safety
  • No OSHA recordable events or lost-time injuries