Ahern recently completed a controls and HVAC project at UW Eau-Claire’s Phillips Hall.  Ahern is one of four certified Distech system integrators in Wisconsin. Each has a limited territory, however, Ahern has the entire state for coverage. Despite a compressed schedule of 90 days and the project starting 1 ½ months late, Ahern’s team of experts completed the project on time and installed the following:

  • 56 Laboratory Fume Hoods
    • Supply standard VAV (variable air volume) box with reheat
    • Exhaust Venturi (TSI)
    • Zone presence sensor at hood
    • Room Occ Sensor
    • Perimeter Radiation
    • Fume Hood Monitor (TSI)
  • 8 Exhaust Fan Sets
    • Bleed Dampers for Capacity Control
    • Static Pressure Blow Out Dampers

Expertise Provided

Values Delivered

Meeting Deadlines
  • 100% on-time project completion
Quality
  • No warranty rework needed
Safety
  • Zero lost-time injuries