South Shore WWTP Digester Gas ReplacementWastewater treatment plant digester gallery update in Oak Creek, Wisconsin
HVAC Installations:
- Five air handling units
- 10 exhaust fans
- Two supply fans
- Four unit heaters
- Six hot water pumps
- Five boiler stacks
Water/Wastewater Installations:
- Digester gas purifier media removal from 22 gas purifier tanks
- Stainless steel, galvanized steel, and ductile iron piping
- Six new digester gas flowmeters
- Modification to two existing digester gas flowmeters
- Two waste gas flares
- Underground digester gas and natural gas piping
- 14 new condensate/sediment traps
- Stainless steel condensate piping
A NOTE FROM OUR CUSTOMER:
“I have worked with Ahern on several projects, and I am continually impressed with the quality of their work. They take pride in what they do… I would not hesitate to work with them on future water/wastewater treatment jobs.”
Joe Grinker
Resident Engineer
Click here for further project details.
(click on image for larger photos).
|