Pipe Fabrication

Tabs

Overview
Pipe Fabrication

At Ahern, your pipe fabrication project is our specialty. We fabricate and ship piping according to project-specific priorities, and we assist in all aspects of system layout, including budget planning and takeoff preparations. Ahern offers pipe fabrication services and also provides welded piping systems for a variety of systems, some of which include:

Power Generation

  • Biomass
  • Cogeneration
  • Combined Cycle
  • Hydro
  • Nuclear
  • Single-Cycle
  • Solar
  • Thermal

Environmental – Water & Wastewater Treatment

  • Aeration
  • Coagulation
  • Coagulant Aids
  • Desalination
  • Disinfection Filtration
  • Pre-Chlorination
  • Sedimentation

Oil & Gas - Refinery

  • Conversion
  • Purification
  • Separation

Food & Beverage

  • Distribution
  • Manufacturing
  • Packaging

Industrial – Pipeline

  • Launcher/Receiver Stations
  • Metering Stations
  • Transmission

Automotive

  • Manufacturing – Facility Process Piping

Pulp & Paper

  • Manufacturing – Facility Process Piping
  • A53 (B&C), A106 (B&C), A333 Gr. 6, C200, API 5L (X42 – X72)
  • Schedule 5, 10, 20, 30, 40, Standard, 60, 80, 100, 120, 140, XS, XXS, 160 and thickness up to 4”
  • 1/2” – 144” diameter piping
  • A335 - P5, P11, P12, P22, P91
  • Schedule 20, 30, 40, Standard, 60, 80, 100, 120, 140, XS, XXS, 160 and thickness up to 4”
  • 1/2” – 144” diameter piping
  • Alloy 200, 400, 600, 625, AL6XN, Hastelloy C276 and C22.
  • Schedule 10S, 40S and 80S
  • 1/2” – 144” diameter piping
  • A778, A312
  • 304 (L)(H), 316 (L), 317(L)(LMN) 321(H), 254SMO, Duplex LDX 2101 and 2205
  • Schedule 5, 5S, 10, 10S, 20, 30, 40, 40S, Standard, 60, 80, 80S, 100, 120, 140, XS, XXS, 160 and thickness up to 4”
  • 1/2” – 144” diameter piping
Testimonials
The organization and accuracy of Ahern's deliveries to the jobsite have been excellent, and really stood out to our team.

Ryan Pruett, P.E.

Mechanical Engineer

Black & Veatch

On the Bloomingdale, IL WRF Phase 2A Expansion, Ahern was contracted by our firm to provide the fabricated stainless steel air piping from five new high speed turbo compressors to their existing digester structure. We were faced with some fairly serious space constraints and the schedule was very demanding. Working with Ahern, we were able to develop a value-engineered product that not only met the design intentions, but provided an economical solution for our customer.

Kris Komorn

Project Manager

Dahme Mechanical Industries, Inc.