Universal LogisticsDesign/build services for 17,550 square-foot commercial cold storage facility in Lincoln, Nebraska
Fire Protection Installations:
- Double-interlock preaction sprinkler system
- One backflow preventer
- 4,271 linear feet of pipe
- 361 sprinkler heads, including in-rack sprinklers
A NOTE ABOUT THIS PROJECT:
“Although the project team faced tight schedules, complex design, and intricate installations, Ahern Fire Protection made the job a success. This was possible through their up-front communication, field leadership, and flexibility.”
Pat Prochnow
Project Manager