Waupun Surgery Renovation15,000 square-foot hospital addition/remodel in Waupun, Wisconsin
Fire Protection Installations:
- Two wet-pipe sprinkler systems
- 2,200 linear feet of piping
- 265 sprinkler heads
HVAC Installations:
- 2,500 linear feet of copper HVAC piping
- 2,250 linear feet of galvanized steel ductwork
Plumbing Installations:
- 4,000 linear feet of medical gas piping (connecting the new medical vacuum pump, N20 and N2 manifolds, and the existing medical air compressor)
- 1,800 linear feet of sanitary drain, waste, and vent piping
- 1,800 linear feet of domestic water piping
- 800 linear feet of storm conductor piping
- Multiple plumbing fixtures, including: water closets; urinals; lavatories; sinks; scrub sinks; a shower; clinical service sinks; and mop basins
- Wall bracket supports for piping connecting to existing lines (see below center photo)
(click on image for larger photos).
|